This online course is designed to teach you how to create method statements and progress reports for a construction project.
-
Level6
-
Credits15
-
Cost$731 NZ Domestic
-
EFTS0.125
-
Delivery typeOnline only
-
Teaching weeks 16 weeks
-
Workload Approximately 10 hours per week
-
Prerequisites Check entry and other requirements under the qualification you are studying
Once you've completed this course you will be able to
- Develop a pre-contract construction method statement for a construction project.
- Produce a progress report for a construction project.
- Manage resources and logistics to address progress on a construction site.
Assessment
100% internally assessed
Textbooks
No textbooks are required for this course
Computer and internet requirements
To complete this course you will need access to a laptop or desktop computer, reliable broadband internet connection and a data plan able to support online learning such as streaming of videos (including YouTube), downloading content, and writing and submitting online assessments. If you are unsure if your current computer or internet access allows you to complete your online learning with us, please contact us before applying to enrol.
Learn more about our online learning and study tools.
How to enrol
Before enrolling in this course you need to:
- choose the qualification you will study the course under
- check the order that courses in the qualification should be studied in the Qualification Structure table. This is in the Choose courses and apply tab on the qualification page.
Work towards
You can do this course as part of these qualifications:
Certificate of Proficiency
Diploma
Course availability over the next 12 months
|
Jul
|
Aug
|
Sep
|
Oct
|
Nov
|
Dec
|
2027
Jan
|
Feb
|
Mar
|
Apr
|
May
|
Jun
|