Course

Evaluate and prepare a construction programme for quantity surveying


Course code US10045

How to enrol

Before enrolling in this course you need to:

  • Choose the qualification you will study the course under. See the Work towards tab below for qualification options.
  • Check the order that courses in the qualification should be studied in the Qualification Structure table. This is in the Choose courses tab on the qualification page.
  • Level 5  
    Credits
  • Study type Open  
    EFTS 0.0417  
  • Availability
    2018 :  
    This course will start on the first Monday of the month you select for enrolment.
  • Delivery type
    2018 :  
    Print only
  • Workload

    All our open courses have a credit value. For each credit, allow about 10 hours of study. Your workload may be higher around assessment due dates.

  • Fees
    2018 :  
    NZ students $213 + $60 annual administration fee
    International students $646 + $60 annual administration fee
  • Prerequisites Check entry and other requirements under the qualification you are studying